After

The Project

  • Asbestos removal
  • Remove oil tank, oil boiler and associated mechanical and electrical installation
  • Network gas connection, associated civils.
  • 2no. 190kW high efficiency modulating and condensing gas boiler
  • New flues
  • Gas train, circulation pumps, pressurisation unit, valves and pipework
  • New MCC and BMS panel, associated controls
  • Pipe and valve lagging
  • Boiler house painting, new doors, etc.